Attentione of Hot melt adhesive machine used on mattress

Time:2014-09-04 20:51:28Source:SiteViews:653

This chapter mainly described in the installation, operation and maintenance and repair of A series hot melt adhesive machine (Hot Melt Applicator), t...
This chapter mainly described in the installation, operation and maintenance and repair of A series hot melt adhesive machine (Hot Melt Applicator), to provide the relevant safety rules and items, in order to prepare prior preparation, to prevent unnecessary personnel injury and equipment damage.

One, general:
1 daily check of the machinery and equipment is in a safe state, if worn or faulty parts should be replaced promptly.
2 before the operation the device to ensure that all cover, protective device or component failure should be promptly replaced.
3 only trained personnel are allowed to operate the equipment.
4 when it is running, not to repair the equipment cleaning.
5 unless written consent roson company technical equipment, design or may not change the equipment.

Two, installation notes:
1 installation of hot melt machine, must take effective ground, to prevent electric shock accidents.
2 according to the hot melt adhesive machine and its ancillary equipment power supply, section and pay attention to insulation.
3 according to the specified circuit or air power, and pay attention to the correct access zero line, the line of fire.

Three, attention to the use of:
1 keep the working area organized bright, avoid in a volatile, explosive materials or gases around the operation of hot melt adhesive machine.
2 avoid without protection, appropriate good insulation panels or good operation using hot melt machine.
3 don't below zero and fifty degrees above the operating conditions and the use of hot melt adhesive machine.
4 hot melt glue machine can not place any object, move, only the base force, any other place can't.
5 installation of insulation pipe, to avoid damage to the pipe body and the surface, the installation of minimum curvature diameter must be greater than 300mm.
6 in order to prevent the insulation pipe cannot proper cooling, should avoid the insulation pipe is arranged in a closed container.
Thermal insulation pipe 7 using longer, should prevent the insulation pipe and the ground or a cold surface contact, otherwise it will cause gum flow impeded, or even completely blocked.
8 the use of hot melt glue gun, absolutely not allow the nozzle to anyone.
9 nozzle combination directly exposed to the air, should avoid the rapid air flow place, or do wind treatment.
10 as far as possible in the operation of all equipment in a rubber pad, are not allowed to stand in the regional operating equipment with water, to avoid running the equipment in high temperature condition. Rubber film wrapping all exposed terminals and the working area part, avoid electricity, due to contact to cause accidents, the harm to human body and directly touch the power caused harm to the human body the same.

Four, maintenance repair note:
1 only qualified personnel may on maintenance and repair of hot melt adhesive machine, before maintenance repair hot melt adhesive machine to work, must cut off the power supply of the machine completely, to prevent electric shock accidents.
2 in the maintenance and repair with an electric heating part, must wear safety gloves, goggles and long sleeved clothes, avoid scalding.
3 loose or install pressure joint, must determine the hot melt glue machine operating pressure has been reduced to zero.
4 cleaning hot melt glue barrel, cannot use the flame or sharp tools, avoid scratching the surface glue barrel.
5 if the leakage, leakage, can not continue to use the hot melt glue machine.
6 daily check the machine is in a safe state, if worn or faulty parts should be replaced promptly.

The use of five, adhesive and solvent note:
Hot melt adhesive:
The use of high temperature hot melt adhesive, must be careful not to burn, the rubber personnel to do the security.
Heating the solvent:
1) the use of heating solvent cleaning with viscose element, absolutely can not use the flame and control of heating equipment no temperature.
2) do not use can lead to cleaning paint solvents have glue component, because this kind of solvent easy combustion, explosive, volatile, toxic gas at high temperature and time.
3) before the use of cleaning agents, good indoor ventilation, and avoid the long time work in a cleaner environment, to avoid poisoning.
4) cleaning solvents used are as follows: two iodine methane chloride, three chloroiodomethane, carbon tetrachloride, chloroform, two chlorine nitrate oxide, two vinyl chloride, dichloromethane, chlorobenzene, chloro toluene, trichloroethylene, perchloroethylene, ethylene dibromide, bromo methane, two chloro bromo methane, ethane iodide, methyl iodide, iodine propane.

Six, high temperature liquid hot melt adhesive scald:
Scalds, should immediately to the injury or flushing cooling with cold water immersion, until the hot melt adhesive until completely cooled, doing cleaning, irrigation, bandaging treatment, if the area is too large, it is dangerous, in the finish cooling treatment, the injured were sent to hospital immediately.
1 high temperature protection:
If no protective equipment skin contact sol or heating equipment components may occur in severe burns.
In the hot melt equipment operation, at any time to wear safety goggles, temperature resistant gloves, long sleeved clothes.
The 2 part of the circuit:
Several parts of dangerous voltage exists in equipment, the equipment is energized, shall not contact wiring or printed circuit board exposed. Before open the protection panel, disconnect switch is connected with the external power supply.
3 high pressure:
In order to avoid body injury, the correct installation of the no cover protective cover and the safety protection device, shall not operate the equipment.
Avoid hot melt ejection causes serious injury, repair gum road in plastic pressure parts, must put glue way pressure to the pressure relief, and then remove the relevant parts (such as lance head glue pump or pipe)
4 protective cover:
In order to avoid body injury, the correct installation of the no cover protective cover and the safety protection device, shall not operate the equipment.
The protective device shall not disassemble, internal equipment operation of machinery and equipment energized condition, or regulating device.
In order to prevent the serious attack, unless the equipment to break the circuit, can the protective device is installed in the respective components.
5 eye protection:
Wear protective goggles with side, wearing protective goggles improperly may cause serious personal injury.
When the operation of hot melt adhesive machine, protect your eyes is very important.   
  
  

Hot Melt Machine | Box Sealing Machine | Automation Machine | Guns And Hoses | News| about us |Contact us


Contacts : Mr Hou phone : 189 0246 2329
Fax : 0755-89619956
E-amail : nuokeshebei@163.com
web:cabet900
Adress :No. 74, Ainan Road,Longdong Community,Longgang District,Shenzhen,China.
Copyright 2014 all rights reserved:Shenzhen Nuosheng technology development co., LTD

The Alibaba Website